Cement calculator

Plan a cement-based batch using your specified volume proportions and measured yield. Choose concrete, mortar or cement paste.

Calculator

Loose dry volume before waste
1.54
Loose dry volume including waste
1.694
Loose cement volume
0.282
Cement required
406.56
Whole cement bags
17
Loose sand volume
0.565
Loose gravel volume
0.847
Mixing water mass
203.28
Mixing water volume
0.203
Cement purchase cost
$204.00
Estimated material cost
$283.05
Cost per finished m3 ($)
283.053
Batch allowances
MaterialVolume (m3)Cost ($)
Cement0.2823204.0000
Sand0.564728.2333
Gravel0.847050.8200

Advertisement

How this calculator works

Convert finished volume to a loose dry-material allowance using a factor from your mix design or trial batch. Divide that allowance among the volume parts, then convert loose cement volume to mass using its bulk density. The initial 1:2:3 ratio and 1.54 factor are estimating assumptions, not strength grades. Cement particle density is not the loose bulk density used here. Water is based on the cement actually needed, rather than all the cement in rounded purchase bags. Prices are in Canadian dollars.

Formula

Dry volume = wet volume x dry factor; allowance = dry volume x (1 + waste); cement volume = allowance x cement parts / total parts; cement mass = cement volume x bulk density; water mass = cement mass x water-cement ratio; bags = ceil(cement mass / bag mass).

Worked example

For 1 m3 wet volume, factor 1, no waste and a 1:2:3 mix, cement occupies 1/6 m3. At 1200 kg/m3 this is 200 kg, or eight 25 kg bags. A water-cement mass ratio of 0.5 calls for 100 kg of water before aggregate-moisture corrections.

Advertisement

Frequently asked questions

Does a ratio guarantee concrete strength?

No. Strength also depends on cement, aggregates, water, compaction and curing. Use an approved mix design for structural work.

Why use a dry-volume factor?

Loose constituents contain voids that are reduced during mixing. The factor is specific to the materials and measured batch yield; 1.54 is only an initial planning assumption.

Can I use this water quantity directly?

Account for water carried by wet sand and gravel, absorption and admixtures. Follow the specified effective water-cement ratio rather than adding water solely for workability.